Services — Söul Design
× Home Gallery About Services Book a consultation →

info@souldesign.ae

Services

Everything a villa needs, drawn by one studio.

Six disciplines, six phases, one contract. From the first massing sketch to the day you are handed the keys — with the same two principals on the project throughout.

The six disciplines How a villa comes together
RIBA Chartered Architect SBID Accredited Designer 10+ years in the UAE

The Söul difference

Six disciplines. One accountable roof.

Architecture, interiors, landscape, lighting, structure and MEP are designed together, in one studio, under one contract. Every drawing is coordinated before it reaches site — and when a question arises, there is exactly one number to call.

Below is what each discipline actually produces on a Söul villa. Any of them can be appointed on its own; together they are the reason nothing is discovered late.

01

Architecture

Massing, orientation and the architectural idea — how the villa sits on the plot, where the light comes from, and which rooms get the view. This is where 80% of what your home will feel like is decided, and it is decided before a single finish is chosen.

It also carries authority strategy: the villa is designed against Dubai Municipality and community regulations from day one, so the scheme you approve is the scheme that gets permitted.

Site & plot analysis

Massing & orientation studies

Plans, sections & elevations

Façade & envelope detailing

Double-height lounge interior

02

Interior Design

Interiors conceived with the architecture, not applied after it. Spatial planning, material language and the joinery that turns a floor plan into a home — resolved while the walls can still move.

We take it to the end: FF&E, art positions, hardware and the final object on the shelf, specified and procured so the room you were shown is the room you walk into.

Concept & material boards

Bespoke joinery packages

FF&E specification

Styling & final dressing

03

Landscape

In this climate the garden is not decoration — it is half the house. Pool, shade structures, planting and the sequence from gate to front door are designed as rooms without a ceiling.

Because it is drawn with the architecture, levels, drainage and irrigation are settled before the slab is poured, not retrofitted around finished hardscape.

Hardscape & level strategy

Pool & water features

Planting & shade design

Irrigation & drainage

Villa façade with layered architectural lighting at dusk

04

Lighting Design

How the villa reads after dark — façade lines traced in light, courtyards and pools glowing softly, trees and textures lit rather than floodlit. The night image of the house is designed as deliberately as the day one.

Inside, layered scenes — ambient, accent and the low evening layer most villas forget — are drawn into the ceiling and joinery details early, so no fixture is cut into a finished slab.

Façade & landscape lighting

Layered lighting layouts

Fixture & ceiling detailing

Scene & control programming

05

Structure

Spans, slabs and cantilevers resolved alongside the plan rather than after it. The double-height void, the column-free living room and the twelve-metre sliding line survive the engineering because the engineer was in the room when they were drawn.

Foundations are set against the real soil report for your plot, so the ground conditions are priced honestly at tender rather than discovered at excavation.

Structural concept

Foundation & soil strategy

Slab & span coordination

Authority structural set

Villa concrete structure under construction
Coordinated MEP services on site

06

MEP Engineering

Cooling, water, power and home systems coordinated into ceiling voids and risers on paper — the single most common source of on-site clashes, removed before the contractor arrives.

Smart home, security, AV and pool plant are planned as part of the same set, so the villa runs quietly and the plant room does not eat the guest suite.

HVAC & cooling design

Water, drainage & pool plant

Power & smart home

Services clash coordination

Appoint one discipline, or all six. Either way, one point of accountability.

Arrange an introductory call

Knowledge, not a pitch

How a villa actually comes together.

01Concept design
02Schematic design
03Detailed design & IFC
04Authority approvals
05Construction & supervision
06Handover

01

Concept design

Massing, orientation, spatial planning and the architectural idea — where 80% of what your villa will feel like is decided. We test two or three genuinely different responses to your plot before narrowing.

Site & brief analysis

Massing options

Concept plans

Mood & material direction

4–6 weeks
Concept design sketch

02

Schematic design

The concept is resolved into real rooms, elevations and interior direction. Structure and MEP begin shaping the design — not correcting it later — and the first honest cost picture appears.

Developed plans & elevations

Interior scheme per room

Structural & MEP concept

Preliminary cost plan

6–8 weeks
Schematic design drawing

03

Detailed design & IFC

Every junction, material and fixture documented in a fully coordinated Issued-for-Construction set. This is the document that protects your budget on site — the thicker it is, the fewer variations you sign later.

Full IFC drawing set

Joinery & junction details

Material & fixture schedules

Cross-discipline clash review

10–14 weeks
Detailed design drawing

04

Authority approvals

Dubai Municipality, utility authorities and community developer NOCs — run in parallel with design, not after it, so nothing waits. We prepare, submit, and chase; you sign where required.

Municipality submission

Community developer NOC

DEWA & utility clearances

Building permit

In parallel
Authority approvals illustration

05

Construction & supervision

Contractor tendering and bid levelling first, then site supervision by the same team that drew the villa — design intent defended weekly, on site, with monthly reporting against programme and budget.

Tender & bid evaluation

Weekly site supervision

Shop drawing review

Monthly cost & programme report

16–22 months
Construction and supervision illustration

06

Handover

Snagging, completion certification, and a villa delivered as one finished thought — architecture, interiors and landscape together, styled and ready to be lived in rather than finished around you.

Snagging & de-snagging

Completion certification

FF&E install & styling

O&M manuals & warranties

4–6 weeks
Handover illustration

Understanding your investment

What goes into the number.

Design fees on a private villa are a rate per square foot, set by the level of design you ask of us — not a percentage of construction cost. Knowing how the number is built tells you exactly what you are buying before you commit to anything.

01

A fixed fee, agreed before we start

Staged against design phases — not a percentage that grows with your construction cost. You know the full design investment on day one.

02

Driven by area and scope

Built-up area and the disciplines appointed — interiors, landscape and lighting, site supervision — shape the fee. Nothing else, and nothing hidden.

03

What it buys

A fully coordinated villa, documented to the level where contractors price accurately and site surprises stay rare.

Where the fee starts

From AED 60 per sq ft

The rate reflects the level of design your villa calls for — a clean, considered home at one end, fully bespoke detailing across every discipline at the other. Your built-up area sets the scale; the design level sets the rate. Both are fixed in writing at proposal stage.

Discuss your plot

What working together looks like

A known process, not an unknown commitment.

01

The consultation

A focused conversation about your plot, your brief and how the project would run. No pitch, no obligation.

02

Concept & proposal

A first design response to your plot, alongside a clear scope, fee and programme — so you decide with everything visible.

03

Design & approvals

Structured design phases with fixed review points. You make a handful of decisions well, at the right moments — we carry the rest.

04

Site & handover

The same principals supervise construction and hand you the keys. One team, answerable for the whole.

Before you ask

The questions every client should ask.

How long does a villa take, realistically?

+

Around 5–7 months of design, with authority approvals running in parallel, then 16–22 months of construction depending on size and complexity. We give you a programme at proposal stage and report against it monthly.

How are your fees structured?

+

A fixed fee agreed before we start, staged against design phases — not a percentage that grows with your construction cost. You know the full design investment on day one.

Can we appoint you for interiors only?

+

Yes. Any discipline can be appointed on its own — interiors only, landscape only, or supervision on a villa someone else designed. The advantage of the full appointment is coordination, but it is not a condition of working with us.

Do you handle authority approvals and site supervision?

+

Both. Dubai Municipality, utilities and community developer approvals are part of the core appointment, and we strongly recommend our supervision scope so the team that designed the villa is the team defending it on site.

How involved do we need to be?

+

As much or as little as you choose. The process is built around a small number of structured review points; between them, we work. Many of our clients are overseas for most of the project.

How do you handle privacy?

+

Discretion is default. Nothing about your project — name or location — is published or shared without written consent, and most of our work never appears publicly at all.

The consultation

One focused hour on your plot, your vision, and how the project would run.

Not a sales pitch. You leave with a clear view of what your plot allows, a realistic programme, and an honest sense of whether we are the right team for it.

Book a design consultation

We take on a limited number of villas each year.